Browse by UCL people
Group by: Type | Date
Number of items: 31.
Article
Atli, Kubra;
Krystallis, Ilias;
(2025)
Design flexibility in managing infrastructure projects: Contributing factors and research avenues.
International Journal of Project Management
, 43
(1)
, Article 102675. 10.1016/j.ijproman.2025.102675.
|
Denicol, J;
Davies, A;
Krystallis, I;
(2020)
What Are the Causes and Cures of Poor Megaproject Performance? A Systematic Literature Review and Research Agenda.
Project Management Journal
10.1177/8756972819896113.
(In press).
|
Krystallis, Ilias;
(2024)
Flexible Infrastructure Design: A Real Options Reasoning Approach to Navigating Uncertainty in Large-Scale Projects.
Journal of Management in Engineering
, 40
(3)
, Article 04024012. 10.1061/JMENEA.MEENG-5678.
|
Krystallis, Ilias;
Cardin, Michel;
de Neufville, Richard;
(2025)
Designing Flexibility for Strategic Decision-Making in Infrastructure Projects, Real Options, and Managing Uncertainty.
IEEE Transactions on Engineering Management
|
Krystallis, Ilias;
Jasim, Sarah;
(2023)
Charting the path towards a long-term knowledge brokerage function: an ecosystems view.
Humanities and Social Cciences Communications
, 10
, Article 760. 10.1057/s41599-023-02294-6.
|
Krystallis, Ilias;
Kalra, Jas;
Locatelli, Giorgio;
(2025)
Orchestrating governance reconfiguration of inter-organizational project networks to address coordination failures.
International Journal of Production Economics
, 285
, Article 109637. 10.1016/j.ijpe.2025.109637.
|
Krystallis, Ilias;
Locatelli, Giorgio;
(2022)
Normalizing White-Collar Wrongdoing in Professional Service Firms.
Journal of Management in Engineering
, 38
(5)
, Article 04022049. 10.1061/(ASCE)ME.1943-5479.0001079.
|
Krystallis, Ilias;
Locatelli, Giorgio;
Papadonikolaki, Eleni;
(2023)
Captain and conscript or companions in operational reconfiguration? The case of an infrastructure owner with projects and asset management units.
Production Planning & Control
10.1080/09537287.2023.2249438.
(In press).
|
Krystallis, I;
(2019)
Fit for the future.
The Bartlett Review
, 2019
|
Krystallis, I;
Locatelli, G;
Murtagh, N;
(2021)
Talking about futureproofing: real options reasoning in complex infrastructure projects.
IEEE Transactions on Engineering Management
(In press).
|
Krystallis, I;
Locatelli, G;
Murtagh, N;
(2020)
Futureproofing Complex Infrastructure Projects Using Real Options.
IEEE Engineering Management Review
10.1109/EMR.2020.3036446.
(In press).
|
Krystallis, I;
Vernikos, V;
El-Jouzi, S;
Burchill, P;
(2016)
Future-proofing governance and BIM for owner operators in the UK.
Infrastructure Asset Management
, 3
(1)
pp. 12-20.
10.1680/jinam.15.00015.
|
Papadonikolaki, E;
Krystallis, I;
Morgan, B;
(2022)
Digital Technologies in Built Environment Projects: Review and Future Directions.
Project Management Journal
, 53
(5)
pp. 501-519.
10.1177/8756972821107022.
|
Pascale, F;
Pantzartzis, E;
Krystallis, I;
Price, ADF;
(2020)
Rationales and practices for dynamic stakeholder engagement and disengagement. Evidence from dementia-friendly health and social care environments.
Construction Management and Economics
, 38
(7)
pp. 623-639.
10.1080/01446193.2019.1679383.
|
Sandoval, Juan;
Krystallis, Ilias;
Whitmore, David;
Huemann, Martina;
(2025)
Managing strategic relationships in inter-organisational projects.
Production Planning and Control
10.1080/09537287.2025.2554161.
(In press).
|
Tannir, Mohamad;
Mills, Grant;
Krystallis, Ilias;
Kalra, Jas;
(2023)
Governance, cooperation and coordination in large inter-organisational project networks: a viable system perspective.
International Journal of Operations & Production Management
10.1108/ijopm-08-2022-0485.
(In press).
|
Whitmore, David;
Krystallis, Ilias;
Papadonikolaki, Eleni;
Ford, Jordan;
Cleaver, Matt;
Alexander, David;
(2024)
Digital twins in the asset lifecycle: are we there yet?
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law
, 177
(4)
pp. 184-192.
10.1680/jmapl.23.00003.
|
Whitmore, D;
Papadonikolaki, E;
Krystallis, I;
Locatelli, G;
(2021)
Are megaprojects ready for the Fourth Industrial Revolution?
Proceedings of the Institution of Civil Engineers - Management, Procurement and Law
, 174
(2)
pp. 49-58.
10.1680/jmapl.20.00002.
|
Book chapter
Krystallis, I;
Koistinen, K;
(2021)
Predictions from Transitions Theories, Dynamic Capabilities and Real Options Theory on the Role of Governments as Agents of Sustainability.
In: Teerikangas, S and Onkila, T and Koistinen, K and Mäkelä, M, (eds.)
Research Handbook of Sustainability Agency.
(pp. 331-345).
Edward Elgar: Cheltenham, UK.
|
Seymour, Colin;
Fouseki, Kalliopi;
Krystallis, Ilias;
(2023)
COVID-19 a Disaster for Heritage Business Models – Victoria & Albert Museum Case Study.
In: Dixit, Saurabh Kumar and Piramanaygam, Senthilkumaran, (eds.)
Teaching Cases in Tourism, Hospitality and Events.
(pp. 81-99).
CAB International
|
Proceedings paper
Denicol, J;
Krystallis, I;
Davies, AC;
(2018)
Understanding the causes and cures of poor performance in megaprojects: A systematic literature review and research agenda.
In:
IRNOP 2018 Proceedings.
IRNOP: Melbourne, Australia.
|
Krystallis, I;
Demian, P;
Price, A;
(2013)
Supporting future-proof healthcare design by narrowing the design space of solutions using building information modelling.
In: Smith, SD and Ahiaga-Dagbui, DD, (eds.)
Proceedings of the 29th Annual ARCOM Conference 2013.
Association of Researchers in Construction Management (ARCOM)
|
Krystallis, I;
Demian, P;
Price, ADF;
(2012)
Design of flexible and adaptable healthcare buildings of the future: a BIM approach.
In: Greenwood, D, (ed.)
First UK Academic Conference On BIM: Conference Proceedings.
(pp. pp. 222-232).
BIM Academy, Northumbria University: Newcastle, UK.
|
Krystallis, I;
Murtagh, N;
Rickaby, B;
(2019)
A sustainable built environment for healthcare: generative mechanisms for future-proofing.
In:
Proceedings of SBE 19: Emerging Concepts for Sustainable Built Environment.
Sustainable Built Environment (SBE) Conference: Helsinki, Finland.
|
Krystallis, I;
Papadonikolaki, E;
Iuorio, O;
Locatelli, G;
(2019)
Towards a methodology for quantifying the benefits of BIM.
In: O’Donnell,, James and Chassiakos, Athanasios and Rovas, Dimitrios and Hall, Daniel, (eds.)
Proceedings of 2019 European Conference on Computing in Construction (EC3).
(pp. pp. 19-24).
European Council on Computing in Construction (EC3): Chania, Greece.
|
Papadonikolaki, E;
Krystallis, I;
Morgan, B;
(2020)
Digital transformation in construction-Systematic literature review of evolving concepts.
In:
Proceedings of the Engineering Project Organization Conference (EPOC) 2020.
Engineering Project Organization Society (EPOS)
|
|
Rickaby, B;
Krystallis, I;
Davies, A;
(2018)
Managing uncertainty (opportunities and threats) in megaprojects.
In: Walker, Derek, (ed.)
Proceedings of the 14th International Research Network on Organizing by Projects (IRNOP 2018).
International Research Network on Organizing by Projects (IRNOP): Melbourne, Australia.
|
Tannir, M;
Mills, G;
Krystallis, I;
(2019)
Cybernetics in Project Management: a conceptual framework to analyze and enhance the performance of alliances via the application of Viable System Model.
In:
BAM2019 Proceedings.
BAM: Birmingham, UK.
|
Report
Krystallis, Ilias;
Papadonikolaki, Eleni;
Morgan, Bethan;
(2022)
Evidence on the Role of Digital Technologies in Built Environment Projects.
UCL Public Policy: London, UK.
|
Thesis
Krystallis, Ilias;
(2016)
A study of the concept of future-proofing in healthcare building asset management and the role of BIM in its delivery.
Doctoral thesis (Ph.D), Loughborough University.
|
Digital scholarly resource
Krystallis, I;
(2020)
Practical tips for engagement between policymakers and scientists.
[Digital scholarly resource].
https://medium.com/policy-postings/practical-tips-...
|