UCL Discovery
UCL home » Library Services » Electronic resources » UCL Discovery

Least Economic Cost Regional Water Supply Planning – Optimising Infrastructure Investments and Demand Management for South East England’s 17.6 Million People

Padula, S; Harou, JJ; Papageorgiou, LG; Ji, L; Ahmad, M; Hepworth, N; Least Economic Cost Regional Water Supply Planning – Optimising Infrastructure Investments and Demand Management for South East England’s 17.6 Million People. Water Resources Management , 27 (15) 5017 - 5044. 10.1007/s11269-013-0437-6. Green open access

[thumbnail of Padula_et_al_2013_-_Least-economic_cost_regional_water_supply_planning.pdf]
Preview
PDF
Padula_et_al_2013_-_Least-economic_cost_regional_water_supply_planning.pdf

Download (665kB)

Abstract

This paper presents a deterministic capacity expansion optimisation model designed for large regional or national water supply systems. The annual model selects, sizes and schedules new options to meet predicted demands at minimum cost over a multi-year time horizon. Options include: supply-side schemes, demand management (water conservation) measures and bulk transfers. The problem is formulated as a mixed integer linear programming (MILP) optimisation model. Capital, operating, carbon, social and environmental costs of proposed discrete schemes are considered. User-defined annual water saving profiles for demand management schemes are allowed. Multiple water demand scenarios are considered simultaneously to ensure the supply–demand balance is preserved across high demand conditions and that variable costs are accurately assessed. A wide range of supplementary constraints are formulated to consider the interdependencies between schemes (pre-requisite, mutual exclusivity, etc.). A two-step optimisation scheme is introduced to prevent the infeasibilities that inevitably appear in real applications. The model was developed for and used by the ‘Water Resources in the South East’ stakeholder group to select which of the 316 available supply schemes (including imports) and 511 demand management options (considering 272 interdependencies) are to be activated to serve the inhabitants of South East of England. Selected schemes are scheduled and sized over a 25 year planning horizon. The model shows demand management options can play a significant role in the region’s water supply and should be considered alongside new supplies and regional transfers. Considering demand management schemes reduced overall total discounted economic costs by 10 % and removed two large reservoirs from the least-cost plan. This case-study optimisation model was built using a generalised data management software platform and solved using a mixed integer linear programme.

Type: Article
Title: Least Economic Cost Regional Water Supply Planning – Optimising Infrastructure Investments and Demand Management for South East England’s 17.6 Million People
Open access status: An open access version is available from UCL Discovery
DOI: 10.1007/s11269-013-0437-6
Publisher version: http://dx.doi.org/10.1007/s11269-013-0437-6
Language: English
Additional information: © The Author(s) 2013. This article is published with open access at Springerlink.com
Keywords: Water supply planning, Capacity expansion optimisationm Economic-engineering, Infrastructure planning, Demand management, South East England
UCL classification: UCL
UCL > Provost and Vice Provost Offices > UCL BEAMS
UCL > Provost and Vice Provost Offices > UCL BEAMS > Faculty of Engineering Science
UCL > Provost and Vice Provost Offices > UCL BEAMS > Faculty of Engineering Science > Dept of Chemical Engineering
UCL > Provost and Vice Provost Offices > UCL BEAMS > Faculty of Engineering Science > Dept of Civil, Environ and Geomatic Eng
URI: https://discovery.ucl.ac.uk/id/eprint/1400037
Downloads since deposit
0Downloads
Download activity - last month
Download activity - last 12 months
Downloads by country - last 12 months

Archive Staff Only

View Item View Item