UCL Discovery
UCL home » Library Services » Electronic resources » UCL Discovery

The Adopted Procurement Systems in the Construction Processes of the Informal Settlements in Beirut

Sadek, K; El Bastawissi, I; Raslan, RM; Sayary, S; (2018) The Adopted Procurement Systems in the Construction Processes of the Informal Settlements in Beirut. In: BAU Journal: Health & Well-Being. (pp. pp. 350-362). Beirut Arab University: Beirut, Lebanon. Green open access

[thumbnail of BAU paper.pdf]
Preview
Text
BAU paper.pdf - Published Version

Download (2MB) | Preview

Abstract

Compared to other cities, the construction of informal settlements in the city of Beirut is caused by a range of interrelated factors including population growth, ruralurban migration and political intrigues. These settlements follow a reverse development process where people occupy the land, then build on it, install infrastructures, and finally, acquire ownership. The aim of this study is to identify the adopted procurement methods in the construction process of informal settlements in Beirut through the different construction phases of these settlements. The methodology used in this study is based on a qualitative analysis of the informal housing in Beirut as a case study. The analysis focuses on the role and the responsibilities of the main actors and stakeholders in the construction process while relating this process to the construction procurement systems categories: Separated and Cooperative System (Design/Bid/Build), Integrated System (Design/Build), and Management Oriented System. The results of this study help identify the gaps in the processes adopted in the construction of the dwelling units in the informal settlements, which lead to the unorganized development of these settlements impacting the image of the city as one that is permanently under construction .

Type: Proceedings paper
Title: The Adopted Procurement Systems in the Construction Processes of the Informal Settlements in Beirut
Event: Urban Health & Wellbeing Building Collaborative Intelligence for Better Lives in Cities
Location: Beirut, Lebanon
Dates: 23 October 2018 - 25 October 2018
Open access status: An open access version is available from UCL Discovery
Publisher version: http://www.uhwb18.bau.edu.lb/Program
Language: English
Additional information: This is the published version of record. For information on re-use, please refer to the publisher’s terms and conditions.
Keywords: Construction Process, Informal Settlement, Procurement Systems, Beirut
UCL classification: UCL
UCL > Provost and Vice Provost Offices > UCL BEAMS
UCL > Provost and Vice Provost Offices > UCL BEAMS > Faculty of the Built Environment
UCL > Provost and Vice Provost Offices > UCL BEAMS > Faculty of the Built Environment > Bartlett School Env, Energy and Resources
URI: https://discovery.ucl.ac.uk/id/eprint/10064915
Downloads since deposit
202Downloads
Download activity - last month
Download activity - last 12 months
Downloads by country - last 12 months

Archive Staff Only

View Item View Item