Tan, T;
Lu, W;
Li, C;
Chen, K;
Tan, G;
(2020)
Implementation of Design for Manufacture and Assembly principles in the construction project: A case study.
In:
Proceedings of Construction Research Congress 2020 (CRC 2020).
(pp. pp. 907-915).
ASCE: Tempe, AZ, USA.
Preview |
Text
Tan_CRC2020_Full_Paper_259.pdf - Accepted Version Download (891kB) | Preview |
Abstract
Design for manufacture and assembly (DfMA) has been increasingly advocated by the global construction industry since it provides methodological procedures for evaluating and improving design for both manufacture and assembly. Many studies have investigated the DfMA principles suitable for different types of construction projects and advocated a wide implementation of DfMA in construction. However, it would be difficult to persuade stakeholders to implement DfMA principles in their projects without a clear specification of implementation procedures. This study aims to offer an intelligible description and analysis of implementation procedures of DfMA in a real construction project. It does so by undertaking a case study on a prefabricated bamboo building, in which a DfMA-focused design was required by the client. The study reveals how the knowledge of designer, engineer, and contractor has been integrated to implement DfMA principles in the design of building components and sub-components. This study also identifies the best practice of ensuring engineering performance and meanwhile attaining aesthetics in the application of DfMA principles.
Type: | Proceedings paper |
---|---|
Title: | Implementation of Design for Manufacture and Assembly principles in the construction project: A case study |
Event: | Construction Research Congress 2020 (CRC 2020) |
Location: | Phoenix, US |
Dates: | 08 March 2020 - 10 March 2020 |
Open access status: | An open access version is available from UCL Discovery |
DOI: | 10.1061/9780784482889.096 |
Publisher version: | https://doi.org/10.1061/9780784482889.096 |
Language: | English |
Additional information: | This version is the author accepted manuscript. For information on re-use, please refer to the publisher’s terms and conditions. |
UCL classification: | UCL UCL > Provost and Vice Provost Offices UCL > Provost and Vice Provost Offices > UCL BEAMS UCL > Provost and Vice Provost Offices > UCL BEAMS > Faculty of the Built Environment UCL > Provost and Vice Provost Offices > UCL BEAMS > Faculty of the Built Environment > The Bartlett Sch of Const and Proj Mgt |
URI: | https://discovery.ucl.ac.uk/id/eprint/10096762 |
Archive Staff Only
View Item |