Integrating BIM with building performance analysis in project life-cycle

Jin, R; Zhong, B; Ma, L; Hashemi, A; Ding, L; (2019) Integrating BIM with building performance analysis in project life-cycle. Automation in Construction , 106 , Article 102861. 10.1016/j.autcon.2019.102861. Green open access

[thumbnail of Ma_Integrating BIM with building performance analysis in project life-cycle_AAM.pdf]
Preview
Text
Ma_Integrating BIM with building performance analysis in project life-cycle_AAM.pdf - Accepted Version

Download (877kB) | Preview

Abstract

Adopting Building Information Modelling (BIM) in Building Performance Analysis (BPA) is becoming an emerging research area in the application of information technology in the Architecture, Engineering, and Construction (AEC) industry. To investigate the current state of research in the adoption of BIM in BPA, this study performed a holistic review consisting of a bibliometric analysis of existing literature, content analysis of selected studies, as well as follow-up qualitative discussion in BIM integration with BPA. The bibliometric analysis identified 60 relevant studies; the content analysis of these studies revealed the research focuses of BIM-enabled BPA, including interoperability, semantics, and sustainability rating systems; the qualitative discussion further highlighted the learning process throughout project delivery stages and addressed the potential gap between ‘as-designed’ building performance and ‘as-built’ performance. Overall, this study contributes to existing research by identifying key input attributes and workflow in BPA, reviewing the state-of-the-art research on BIM integration with BPA, and investigating the major research areas, namely, interoperability issues in BIM-enabled BPA within the context of life-cycle BPA.

Type: Article
Title: Integrating BIM with building performance analysis in project life-cycle
Open access status: An open access version is available from UCL Discovery
DOI: 10.1016/j.autcon.2019.102861
Publisher version: https://doi.org/10.1016/j.autcon.2019.102861
Language: English
Additional information: This version is the author accepted manuscript. For information on re-use, please refer to the publisher’s terms and conditions.
Keywords: Building information modelling, Building performance analysis, Interoperability, Level of details, Energy performance
UCL classification: UCL
UCL > Provost and Vice Provost Offices > UCL BEAMS
UCL > Provost and Vice Provost Offices > UCL BEAMS > Faculty of the Built Environment
URI: https://discovery.ucl.ac.uk/id/eprint/10076621
Downloads since deposit
509Downloads
Download activity - last month
Download activity - last 12 months
Downloads by country - last 12 months

Archive Staff Only

View Item View Item