Oraee, M;
Hosseini, MR;
Edwards, DJ;
Li, H;
Papadonikolaki, E;
Cao, D;
(2019)
Collaboration barriers in BIM-based construction networks: A conceptual model.
International Journal of Project Management
, 37
(6)
pp. 839-854.
10.1016/j.ijproman.2019.05.004.
Preview |
Text
2019_IJPM_Collaboration Barriers in BIM-based Construction Networks- A Conceptual Model_Oraee.pdf - Accepted Version Download (6MB) | Preview |
Abstract
Building information modelling (BIM) teams, hereafter referred to as BIM-based construction networks, are teams whose possibly geographically dispersed members from various organisations and disciplines, perform project tasks on BIM-enabled projects. In recent years, BIM-based construction networks have progressively become the norm in executing BIM activities on projects. However, even though achieving BIM's full capabilities relies on effective collaboration among the team members in BIM-based construction networks, it is still a struggle for these members to collaborate. Nonetheless, only a few studies have been conducted to identify the barriers to strengthening team collaboration in BIM-based construction networks. To address this gap, the current study, by examining 73 journal articles on collaboration in BIM-based construction networks, builds upon a theoretical review of the literature. A conceptual model is presented to capture the main barriers to collaboration in BIM-based construction networks. The study benefits researchers as well as project managers. For researchers, the conceptual model provides an intermediate theory, namely, a theoretical basis to direct further knowledge creation attempts on the topic. In addition, the conceptual model supports project managers on BIM-enabled projects. That is, it simplifies the knowledge now available for practical applications enabling it to be translated into guidelines and practical instructions on real-life projects.
Type: | Article |
---|---|
Title: | Collaboration barriers in BIM-based construction networks: A conceptual model |
Open access status: | An open access version is available from UCL Discovery |
DOI: | 10.1016/j.ijproman.2019.05.004 |
Publisher version: | https://doi.org/10.1016/j.ijproman.2019.05.004 |
Language: | English |
Additional information: | This version is the author accepted manuscript. For information on re-use, please refer to the publisher’s terms and conditions. |
Keywords: | BIM-enabled projects, Collaboration, Barriers, Team development, Virtual teams |
UCL classification: | UCL UCL > Provost and Vice Provost Offices > UCL BEAMS UCL > Provost and Vice Provost Offices > UCL BEAMS > Faculty of the Built Environment |
URI: | https://discovery.ucl.ac.uk/id/eprint/10076422 |
Archive Staff Only
View Item |