Herroelen, W and Demeulemeester, E and De Reyck, B (2001) A note on the paper "Resource-constrained project scheduling: Notation, classification, models and methods" by Brucker et al. EUR J OPER RES , 128 (3) 679 - 688.
Full text not available from this repository.
Abstract
The great variety of project scheduling problems studied in the ever growing literature motivated the recent development of classification schemes. In a recent paper (European Journal of Operational Research 112 (1999) 3-41), Brucker et al. make the claim that, so far, no classification scheme exists which is compatible with what is commonly accepted in machine scheduling and introduce a new classification. In this note, we critically review major shortcomings of the suggested scheme which place heavy limitations on its potential use. (C) 2001 Elsevier Science B.V. All rights reserved.
| Type: | Article |
|---|---|
| Title: | A note on the paper "Resource-constrained project scheduling: Notation, classification, models and methods" by Brucker et al. |
| Keywords: | project scheduling, machine scheduling, classification scheme |
| UCL classification: | UCL > School of BEAMS > Faculty of Engineering Science > Management Science and Innovation |